The project's duration is established with 3 years,
in detail from July 2003 until June 2006. The important “stations” are
represented by six “milestones”, which are fixed every six months, in
March and September. Basing on these milestones there has been founded a
reporting system.
The
project is structured into 8 work packages which need to be worked on
during the project runtime. They are defined from systematic types of
problems to problems regarding it`s contents so that every upcoming
problem or activity is covered by one work package. Work packages can be
handled over the whole project duration or cover just parts of
it.
For a
general survey take a look at the Time
Schedule.